Measuring team and program level agile maturity

Posted on Posted in Agile

 

Below are the few metrics that can be used to measure the team and program level agile maturity. Remember only every measure 1-2 at a time.

  • Ideation to production elapsed time
  • agility to innovate
  • Cycle time – quickest time to get one feature out
  • Release cycle – time to get a release out
  • Defects  – change in defects
  • Productivity – normalized effort to get a unit of functionality “done”
  • Stabilization – after code complete,  % of a release is spent stabilizing before release
  • Customer satisfaction – up or down
  • Employee satisfaction – up or down

Other metrics to measure high performance software engineering (extreme programming practices).

  • Code coverage
  • Build pipeline based metrics.

Leave a Reply

Your email address will not be published. Required fields are marked *